Latest news:
- Fergus Ewing MSP officially opens FoundOcean's expanded Offshore Service Base in Livingston
- FoundOcean completes grouting at Thornton Bank Offshore Wind Farm Phase II
- FoundOcean shortlisted for the Society of Petroleum Engineers Offshore Achievement Awards 2012
- FoundOcean awarded Nordsee Ost foundation grouting contract by RWE Innogy
- FoundOcean Appointed Licensed Applicator for BASF Exagrout Masterflow 9500®
Ballasting and Underbase Grouting Track Record
| Operator | Client | Date | Platform |
| Talisman | Smit | 2007 | Yme – Underbase grouting |
| Petro Canada | Smit | 2006 | DeRuyter – Underbase grouting |
| Shell | Aker | 2006 | Sakhalin – Underbase grouting design |
| Statoil | Aker Kvaerner | 2004 | Snohvit – 6 subsea bucket foundations |
| Statoil | Saipem UK | 2003 | Kristin – 4 subsea structures/bucket foundations |
| Veba Oil & Gas | Smit | 2000 | Hanze F-2A – Orecreting & ballasting 33,000 tonnes |
| Veba Oil & Gas | Smit | 2000 | Hanze F-2A – Underbase grouting |
| Statoil | Stolt Offshore | 1999 | Jotun – Suction anchor buckets |
| BP | Technip | 1998 | ETAPS template – Underbase grouting |
| Kvaerner Oil & Gas | Aker Maritime | 1998 | Siri – Underbase grouting |
| Statoil | Saipem UK | 1996 | Sleipner SLT – Underbase grouting bucket foundations |
| BP | Aker Maritime | 1995 | ‘Harding’ – Underbase grouting of gravity structure |
| Statoil | Saipem UK | 1994 | Europipe 16/11E – Underbase grouting bucket foundation |
| Statoil | EMC | 1992 | Zeepipe – Template/tie-in and ballasting using high density slurries (3.60 SG) |
| Total | Scott Lithgow/Stolt Offshore | 1991/92 | Bruce SSIS – Levelling and ballasting using free flowing self levelling and high density slurries (from 1.60 to 3.60SG) |
| Britoil | UIE Scotland | 1991 | Amethyst structure – A1-D; 3.60SG Barytes |
| Amoco | Stolt Offshore | 1990 | N W Hutton – Grouting and ballasting of various subsea structures; 3.60 SG |
| BP | Stolt Offshore | 1990 | Forties – T-piece base structure; 3.00SG Barytes |
| Britoil | UIE Scotland | 1990 | Amethyst – Ballasting B1-D; 3.60SG Barytes |
| Sovereign Oil | Technip | 1990 | Emerald Riser Bases – Ballasting 4 subsea structures; 3.55SG |
| Total | Stolt Offshore | 1990 | Alwyn – Subsea barrier pipeline protection and ballasting; 3.60SG |
| Single Buoy Moorings | McDermott Australia | 1986 | Jabiru Mooring System – Barytes ballast |
| Single Buoy Moorings | Single Buoy Moorings | 1986 | Ashland FPSO – VI Yoke nallasting hematite |
| Single Buoy Moorings | Single Buoy Moorings | 1984 | Statfjord 'C' – Single Point Mooring System |
| Single Buoy Moorings | Single Buoy Moorings | 1982 | Tazerka – Single Anchor Leg Storage System (SALMS) - Hematite |
| Britoil | Britoil | 1978 | Thistle – Single Anchor Leg Mooring (SALM) - 2000 tonnes |
Key Features
- Used to secure gravity base structures to the seabed
- Experience of steel and concrete based structures


